"Large Firm Experience, Small Firm Service"
Spokane Office: (509) 241-3885
Boise Office: (208) 344-2470

Archive

Wastewater Treatment Plant

Wastewater Treatment Plant

Provided engineering design and consulting services for upgrades to the existing wastewater treatment plant for the city of Hailey. Design consisted of adding two 200,000-gallon new reinforced concrete digesters and a new process building. The digesters were connected to an existing SBR tank. The new...

Water Reuse Facility

Water Reuse Facility

Provided structural construction documents for this new water processing facility. Projected consisted of a process building to house mechanical water screens and piping. Structural design consisted of a steel framed building, mezzanine, and foundation....

Setai Hotel

Setai Hotel

GLR provided structural design for a new 8,500 SF retractable roof to provide shade for an existing courtyard at the Setai Hotel in Miami Beach, Florida. We worked to come up with a creative design that incorporates 65 foot structural steel spans and the existing...

Residence Inn

Residence Inn

Engineering and structural construction drawings were provided for this four-story light-framed wood structure with concrete masonry cores....

Courtyard

Courtyard

Projected consisted of 100,000 square feet plus 15,000 square feet of roof top patio. 4 story wood framed, structural steel, and masonry construction. Located in a high seismic region, the lateral design of this building utilized a combined lateral system of special reinforced masonry and...

Walla Walla University Smith Hall Addition

Walla Walla University Smith Hall Addition

Project Description: The Smith Hall Building on Walla Walla is currently undergoing an exterior addition to accommodate ADA accessibility. The existing three story building was built in 1964, consisting of concrete construction for the floors and walls. A new elevator is being provided at...

Todd Hall Entrance Remodel

Todd Hall Entrance Remodel

Project Description: A remodel for the north side of Todd Hall is being proposed at the main plaza entrance and also for the lower classroom level. Currently the project is still in the design stages but construction is expected to progress. The lower classroom...

Ready to start?    Let's discuss your project...